Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Papers with keyword scheduling:

Year Paper
Year Paper
2007 Jan Tulke, Jochen Hanff (2007). 4D construction sequence planning – new process and data model. 79
2017 Maryam Montazer, Danijel Rebolj and Detlef Heck (2017). A Comparison Review of Automated Construction Scheduling Methods. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 137-144
2008 Ha_kan Norberg & Thomas Olofsson (2008). A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION. CIB W78 2008 - Improving the management of construction projects through IT adoption
2021 Y Jung, F Amer, M Golparvar-Fard (2021). A systematic review on the requirements on BIM maturity and formal representation of sequencing knowledge for automated construction scheduling. Proceedings of the 38th International Conference of CIB W78, Luxembourg, 13-15 October, pp 429-436
2013 Shah R,Dawood N,Castro S (2013). Automatic generation and visualization of location-based scheduling. CONVR 2013
2004 Tesfagaber G, Bouchlaghem N M (2004). Automation of Process Information Exchange between AEC software Applications using PSL. International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 4, Rotterdam: Millpress Science Publishers
2010 Rolf Büchmann-Slorup, Niclas Andersson (2010). BIM-Based Scheduling of Construction – A Comparative Analysis of Prevailing and BIM-Based Scheduling Processes. CIB W78 2010 - Applications of IT in the AEC Industry
2007 W. Huhnt, F. Enge (2007). Consistent information management for structuring construction activities. 607
2013 Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013). Effective project scheduling under workspace congestion and workflow disturbance factors. CONVR 2013
2011 V Semanov, OTarlapan, S Morozov,K Kazakov, V Zolotov (2011). Global path planning in large-scale environments using metric and topological schemes. Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2013 Siu M-F,Lu M,AbouRizk S (2013). Improving sophistication and representation of skilled labor schedules on plant shutdown and maintenance projects. CONVR 2013
1999 Froese T, Fischer M, Grobler F, Ritzenthaler J, Yu K, Sutherland S, Staub S, Akinci B, Akbas R, Koo B, Barron A, Kunz J (1999). Industry Foundation Classes for Project Management - A Trial Implementation . Electronic Journal of Information technology in Construction, Vol. 4, pg. 17-36.
2017 Dimitra Chondrogianni, Christos Gioldasis and Yorgos Stephanedes (2017). Low-Cost Fleet Management Solutions in the Framework of Emerging Markets. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 561-570
2007 Can Ersen F?rat, Juhani Kiiras, Kalle Kähkönen, Pekka Huovinen (2007). Model based scheduling in building projects – is it oxymoron?. 337
2013 Santos de Andrade, Ludmila; Neander Furtado Silva; Ecilamar Maciel de Lima; Igor Monteiro (2013). Os Sistemas BIM e a Redução de Inexatidões e Tempo nas Obras Públicas Brasileiras. SIGraDi 2013 [Proceedings of the 17th Conference of the Iberoamerican Society of Digital Graphics - ISBN: 978-956-7051-86-1] Chile - Valparaíso 20 - 22 November 2013, pp. 284 - 287
2010 Can Ersen Firat, David Arditi, Juho-Pekka Hamalainen, Johan Stenstrand, Juhani Kiiras (2010). Quantity Take-Off in Model-Based Systems. CIB W78 2010 - Applications of IT in the AEC Industry
1997 Andersson N (1997). Re-engineering of the project planning processstrategic implementation of project management software. Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X
2003 Senouci A B, Naji K K (2003). Resource-constrained scheduling of construction projects using genetic algorithms. International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 1, Issue 3, Rotterdam: Millpress Science Publishers
2007 Janne Porkka, Kalle Kähkönen (2007). Software development approaches and challenges of 4D product models. 85
2013 Bügler M,Dori G,Borrmann A (2013). Swap based process schedule optimization using discrete-event simulation. CONVR 2013
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]